Civil Contracting Projects

We have completed a variety of civil contracting projects in Alberta for major private sector clients, on public infrastructure projects, and for numerous P3 partnerships.

You can view photos of our projects by clicking here.

Outlined below is a list of Completed Projects:

2023 Projects

Project Location Work Performed Owner
Carseland Cole Crescent

Sanitary Removal and Replacement, Fire Hydrant, Gravel Supply & Install, Concrete and Asphalt Paving

Wheatland County
Rocky Mountain Equipment High River Yard

Stripping, Excavation, Site Grading, Gravel Supply & Install, Water & Sanitary, and Asphalt Paving

Rocky Mountain Equipment
Foothills Regional Landfill Cell #7

Stripping, Common Excavation, Clay Liner, HDPE Liner, HDPE Piping, Tire Shred, Gravel Supply & Placement.

Foothills LLRC
Town of High River Watermain Assessment 2023

Excavation, Hydrovac, Shoring, Hot Tap, Gravel Supply & Install, Concrete and Asphalt Paving

Town of High River
     

2022 Projects

Project Location Work Performed Owner
High River Lift Station Forceman Replacement

Excavation, HDPE Piping, Manhole Supply, Hot Tap

Town of High River
Town of High River Watermain Assessment 2022

Excavation, Hydrovac, Shoring, Hot Tap, Gravel Supply & Install, Concrete and Asphalt Paving

Town of High River
Town of Nanton – 20th Ave Lot Servicing

Water & Sanitary Installation, Manhole, Pathway Rehab

Town of Nanton
Vulcan North Industrial Subdivision

Water & Sanitary Installation, Manholes, Gravel Placement, Concrete Curbs, and Asphalt Paving

Town of Vulcan
     

2021 Projects

Project Location Work Performed Owner
Heritage Point River Intake Excavation, Rip Rap, Turbidity Curtain, Repair HDPE, Road Grading, Gravel Supply, Culvert Corix Utilities
Priddis Greens Services Co-Op Infiltration Excavation, Rip Rap, Aqua Barrier, Silt Fence, Seeding Foothills County
Prince of Peace Watermain Extension Watermain, Water Services, PVC, HDPE, Excavation, Road Rehabilitation, TAS Rocky View County
Foothills Regional Landfill Hydrovac Facility Excavation, Retention Ponds, Clay Liner, Erosion Control, Geotextile Geogrid Supply/Install Foothills Regional Services Commission
High River Forcemain & Lift Station Excavation, Lift Station Supply/Install, Underground Water & Sanitary Replacement Town of High River
Gleichen Infrastructure Upgrades Water & Sanitary Replacement, Curbs/Sidewalks, Roadwork, Hydrants, Manholes, Ties-Ins Wheatland County
     

2020 Projects

Project Location Work Performed Owner
Pinebrook Drainage Improvements

Ditching, Backfill & Rip Rap, Gravel Supply/Haul

Rocky View County
Country Lane Estates Drainage Improvements Storm Drainage System & Miscellaneous Ditch/Site Grading, CPS Culvert Rocky View County
Rocky View County Bridge Excavation, Roadwork, CSP & SPCSP Install, Rip Rap Supply & Place, Traffic Accommodation Rocky View County
Aldersyde Raw Water Intake Excavation, Access Road, Rip Rap, Care of Water, HDPE, Concrete Box Culverts, Gabion Baskets, Inlet Structure Foothills County
Western Headworks Canal Silt Removal Silt Removal From Western Headworks Irrigation Canal Alberta Transportation
     

2019 Projects

Project Location Work Performed Owner
Lake Louise Watermain Upgrades HDPE Feeder Main, Water & Sanitary Replacement, Roadworks, Hydrants, Manholes, Landscaping Parks Canada
Kneehill Creek Erosion Protection Excavation, Turbidity Curtain, Rip Rap, Bridge Removal & Replacement Village of Carbon
Fortis Claresholm Structural Excavation/Backfill, Site Grading, Detail Excavation & Slab Preparation, Storm & Sanitary Sewer Fortis Alberta
     

2018 Projects

Project Location Work Performed Owner
Custom Cannabis Site Grading, Structural Excavation/Backfill & Granular Slab Prep., Water & Sanitary Sewer Tie-In & Installation Custom Cannabis
High River Golf Course Dike & North Bank Stabilization Bank Stabilization/Berm Construction, Temporary River Diversion, Rip Rap Supply & Placement, Permanent Erosion Control Measures Town of High River
High River Southeast Main Replacement 5B Water & Sanitary Main Replacement, Storm Sewer Installation, Road Structure, Concrete & Asphalt Surface Works Town of High River
Ghost Lake Boat Launch Site Grading, Rip Rap Supply & Under Water Placement, Water Line Installation, Granular Base Course for Parking Lot Alberta Parks
Lake Louise Water Reservoir Upgrades Deep Structural Excavation/Backfill, HDPE Water Main Installation, Slab on Grade Prep Parks Canada
Eden Valley Water Treatment Plant Site Grading, Water Main & Hydrant Installation, Structural Excavation/Backfill, Supply & Install of Concrete Vaults, Granular Supply & Placement Stoney Tribal Administration
Raw Water Direct Intake Town of Turner Valley Pond Excavating & Grading, Installation of HDPE Water Lines & Concrete Structure, Road Works Town of Turner Valley
     

2017 Projects

Project Location Work Performed Owner
Vulcan County Bridge Large Diameter CSP & SPCSP Culvert Installation, Road Works Vulcan County
Richardson Pioneer Carseland Site Grading & Drainage Improvements Richardson Pioneer
Fortis High River Structural Excavation/Backfill, Site Grading, Detail Excavation & Slab Prep., Storm & Sanitary Sewer Installation Fortis
Cargill Parking Lot Expansion Excavation, Site Grading, Geotextile Placement, Supply, Place & Compact Granular Base Course Cargill
Medicine Hat Crescent Heights Lift Station Deep Structural Excavation/Backfill, Site Grading, Water Lines & HDPE Sanitary Force Main City of Medicine Hat
Fortis Okotoks Structural Excavation/Backfill, Site Grading, Water, Sanitary & Storm Sewer Installation Fortis
Lethbridge Northern Headworks Diversion Weir Temporary Division of Oldman River, Coffer Dam Installation, Dewatering, Fish Salvage, Expose Concrete Slab for Engineer Inspection & Site Restoration Alberta Transportation
Hays Farm Watermain Replacement Watermain Replacement (Pipe Bursting) Diversified Management
     

2016 Projects

Project Location Work Performed Owner
Thomas Drive Bioswale, Strathmore Excavation, Earthworks, Sub-drain & Culvert, Topsoil Restoration, Landscaping Town of Strathmore
Macleod Trail SW Dike Closure, High River Excavation, Manhole/Catch Basin Installation, Slope Protection, Rip-Rap Haul & Place, Roadwork, Curb, Gutter & Sidewalk Town of High River
Notre Dame Collegiate Site Grading & Services, High River Excavation, Site Servicing, Running Track & Football Field Development Christ The Redeemer School Division
AG Grounds Metering Vault Installation, Strathmore Excavation, Metering Vault Installation, Watermain Tie-in, Site Restoration Town of Strathmore
Vulcan County Bridge Culverts, Milo, Lomond & Vulcan Excavation, Bridge Demolition, Roadwork, CSP & SPCSP Install, Concrete End Treatments, Rip-Rap Supply & Place Vulcan County
Notre Dame Collegiate Portable Addition, High River Excavation, Screw Piling Carbon Constructors
     

2015 Projects

Project  Location Work Performed Owner
High River WTP Backwash Storage Structure Excavation/Backfill, Screw Pile Shoring System, Water Lines & Concrete Vaults Town of High River
Town of Nanton Infrastructure Improvements Excavation, Watermain & Hydrant Installation, Roadwork, Culverts, Retention Pond Town of Nanton
Bob Snodgrass Recreation Complex, High River Excavation, Grading & Granular Sub-base Surfacing, Electrical & Light Standard Install, Post & Cable Fencing Town of High River
Janet Substation, Calgary Excavation & Site Drainage Improvements, Rip-Rap, Roadwork, Concrete Culvert, Erosion Control AltaLink c/o Morrison Hershfield
Highway 40 over Lineham Creek, Kananaskis Excavation, Bridgework, Rip-Rap, Erosion Control Alberta Transportation
Vulcan Solar Park, Vulcan Screw Piling Town of Vulcan
     

2014 Projects

Project  Location Work Performed Owner
Western Headworks Canal – Calgary to Chestermere Silt Removal from Irrigation Canal Alberta Transportation
Flood Repairs throughout the MD of Foothills Excavation Work/Sand Bagging & Cleanup MD of Foothills
Highwood River Channel Realignment Excavation/Rip-Rap Slope Protection Town of High River
Wyndam Carseland Park, Bow River Slope Restoration Excavation/Rip-Rap & Sierra Wall Slope Protection Alberta Parks
Wyndam Carseland Park, Day Use Area Restoration Excavation/Grading/Gravel & Other Misc. Repairs Alberta Parks
Sunshine Lake Outfall & Bioswale Repairs Excavation/Piping & Other Repairs required due to 2013 flooding Town of High River
     

2013 Projects

Project  Location Work Performed Owner
Cowley/Lundbreck Water Treatment Plant, Southern Alberta Site Work & Piping MD of Pincher Creek
Harvie Passage, Calgary, AB Emergency Repairs  Alberta Transportation
Little Bow River, Southern Alberta Flood Clean-up MD of Foothills
     

2012 Projects

Project Location Work Performed Owner
Range Road #250, Irricana, AB  Roadway Widening Rockyview County & CN Rail
Western Headworks, Calgary, AB Irrigation Canal Cleaning Alberta Transportation
Maple Reinders Office Site, Calgary, AB Site Preparation, Detail Excavation & Deep Servicing Maple Reinders
Harmattan & Cynthia Oilfield, Central & Southern Alberta Screw Piling  Exxon Mobil
Traction Power Substation, Calgary, AB Screw Piling  City of Calgary
Sheppard Park, High River, AB Bridge Construction  Town of High River
     

2011 Projects

Project Location Work Performed Owner
Harmattan & Cynthia Oilfield, Central & Southern Alberta Screw Piling Exxon Mobil
Gleichen Grain Terminal, Gleichen, AB  Intersection Improvements PTC Construction
Milo Elevator, Milo, AB  Drive Over Concrete Structure Improvements Viterra
Highway #804, Brant, AB Roadway Reconstruction Alberta Transportation
     

2010 Projects

Project Location Work performed Owner
Hertz Rentals, Calgary, AB  Site Preparation & Detail Excavating  Hertz Rentals
Ghost Lake Interchange, Ghost Lake, AB Intersection Interchange Improvements Standard General
Milo Elevator, Milo, AB Elevator Demolition Viterra
Chestermere, AB Site Clean-Up Mattamy Homes
McDougald Reservoir, Maple Creek, SK Reservoir Rehab Agriculture & Agri-Food Canada
Blackie Arena, Blackie, AB Site Preparation & Detail Excavation Blackie and District Agricultural Society
East Lake Park, Airdrie, AB Landscape Improvements & Screw Piling City of Airdrie
Cypress Motors, Swift Current, SK Foundation Screw Piling Cypress Motors
Heritage Hills Reservoir Retaining Wall Demolition & Screw Piling Graham Infrastructure
Picture Butte, AB Solar Project Screw Piling Goose Creek Renewable Energy
     

Office Administration & Accounting
Phone: 403.652.4222

Project Management & Estimating
Phone: 403.336.1243

Field Operations
Phone: 403.899.1068

Safety Management
Phone: 403.652.9753

Mailing Address:

Blackie Site Works Ltd.
P.O. Box 6027
High River, Alberta T1V 1P7
Phone: 403.652.4222

Top