Civil Contracting Projects
We have completed a variety of civil contracting projects in Alberta for major private sector clients, on public infrastructure projects, and for numerous P3 partnerships.
You can view photos of our projects by clicking here.
Outlined below is a list of Completed Projects:
2023 Projects
Project Location | Work Performed | Owner |
---|---|---|
Carseland Cole Crescent |
Sanitary Removal and Replacement, Fire Hydrant, Gravel Supply & Install, Concrete and Asphalt Paving |
Wheatland County |
Rocky Mountain Equipment High River Yard |
Stripping, Excavation, Site Grading, Gravel Supply & Install, Water & Sanitary, and Asphalt Paving |
Rocky Mountain Equipment |
Foothills Regional Landfill Cell #7 |
Stripping, Common Excavation, Clay Liner, HDPE Liner, HDPE Piping, Tire Shred, Gravel Supply & Placement. |
Foothills LLRC |
Town of High River Watermain Assessment 2023 |
Excavation, Hydrovac, Shoring, Hot Tap, Gravel Supply & Install, Concrete and Asphalt Paving |
Town of High River |
2022 Projects
Project Location | Work Performed | Owner |
---|---|---|
High River Lift Station Forceman Replacement |
Excavation, HDPE Piping, Manhole Supply, Hot Tap |
Town of High River |
Town of High River Watermain Assessment 2022 |
Excavation, Hydrovac, Shoring, Hot Tap, Gravel Supply & Install, Concrete and Asphalt Paving |
Town of High River |
Town of Nanton – 20th Ave Lot Servicing |
Water & Sanitary Installation, Manhole, Pathway Rehab |
Town of Nanton |
Vulcan North Industrial Subdivision |
Water & Sanitary Installation, Manholes, Gravel Placement, Concrete Curbs, and Asphalt Paving |
Town of Vulcan |
2021 Projects
Project Location | Work Performed | Owner |
---|---|---|
Heritage Point River Intake | Excavation, Rip Rap, Turbidity Curtain, Repair HDPE, Road Grading, Gravel Supply, Culvert | Corix Utilities |
Priddis Greens Services Co-Op Infiltration | Excavation, Rip Rap, Aqua Barrier, Silt Fence, Seeding | Foothills County |
Prince of Peace Watermain Extension | Watermain, Water Services, PVC, HDPE, Excavation, Road Rehabilitation, TAS | Rocky View County |
Foothills Regional Landfill Hydrovac Facility | Excavation, Retention Ponds, Clay Liner, Erosion Control, Geotextile Geogrid Supply/Install | Foothills Regional Services Commission |
High River Forcemain & Lift Station | Excavation, Lift Station Supply/Install, Underground Water & Sanitary Replacement | Town of High River |
Gleichen Infrastructure Upgrades | Water & Sanitary Replacement, Curbs/Sidewalks, Roadwork, Hydrants, Manholes, Ties-Ins | Wheatland County |
2020 Projects
Project Location | Work Performed | Owner |
---|---|---|
Pinebrook Drainage Improvements |
Ditching, Backfill & Rip Rap, Gravel Supply/Haul |
Rocky View County |
Country Lane Estates Drainage Improvements | Storm Drainage System & Miscellaneous Ditch/Site Grading, CPS Culvert | Rocky View County |
Rocky View County Bridge | Excavation, Roadwork, CSP & SPCSP Install, Rip Rap Supply & Place, Traffic Accommodation | Rocky View County |
Aldersyde Raw Water Intake | Excavation, Access Road, Rip Rap, Care of Water, HDPE, Concrete Box Culverts, Gabion Baskets, Inlet Structure | Foothills County |
Western Headworks Canal Silt Removal | Silt Removal From Western Headworks Irrigation Canal | Alberta Transportation |
2019 Projects
Project Location | Work Performed | Owner |
---|---|---|
Lake Louise Watermain Upgrades | HDPE Feeder Main, Water & Sanitary Replacement, Roadworks, Hydrants, Manholes, Landscaping | Parks Canada |
Kneehill Creek Erosion Protection | Excavation, Turbidity Curtain, Rip Rap, Bridge Removal & Replacement | Village of Carbon |
Fortis Claresholm | Structural Excavation/Backfill, Site Grading, Detail Excavation & Slab Preparation, Storm & Sanitary Sewer | Fortis Alberta |
2018 Projects
Project Location | Work Performed | Owner |
---|---|---|
Custom Cannabis | Site Grading, Structural Excavation/Backfill & Granular Slab Prep., Water & Sanitary Sewer Tie-In & Installation | Custom Cannabis |
High River Golf Course Dike & North Bank Stabilization | Bank Stabilization/Berm Construction, Temporary River Diversion, Rip Rap Supply & Placement, Permanent Erosion Control Measures | Town of High River |
High River Southeast Main Replacement 5B | Water & Sanitary Main Replacement, Storm Sewer Installation, Road Structure, Concrete & Asphalt Surface Works | Town of High River |
Ghost Lake Boat Launch | Site Grading, Rip Rap Supply & Under Water Placement, Water Line Installation, Granular Base Course for Parking Lot | Alberta Parks |
Lake Louise Water Reservoir Upgrades | Deep Structural Excavation/Backfill, HDPE Water Main Installation, Slab on Grade Prep | Parks Canada |
Eden Valley Water Treatment Plant | Site Grading, Water Main & Hydrant Installation, Structural Excavation/Backfill, Supply & Install of Concrete Vaults, Granular Supply & Placement | Stoney Tribal Administration |
Raw Water Direct Intake Town of Turner Valley | Pond Excavating & Grading, Installation of HDPE Water Lines & Concrete Structure, Road Works | Town of Turner Valley |
2017 Projects
Project Location | Work Performed | Owner |
---|---|---|
Vulcan County Bridge | Large Diameter CSP & SPCSP Culvert Installation, Road Works | Vulcan County |
Richardson Pioneer Carseland | Site Grading & Drainage Improvements | Richardson Pioneer |
Fortis High River | Structural Excavation/Backfill, Site Grading, Detail Excavation & Slab Prep., Storm & Sanitary Sewer Installation | Fortis |
Cargill Parking Lot Expansion | Excavation, Site Grading, Geotextile Placement, Supply, Place & Compact Granular Base Course | Cargill |
Medicine Hat Crescent Heights Lift Station | Deep Structural Excavation/Backfill, Site Grading, Water Lines & HDPE Sanitary Force Main | City of Medicine Hat |
Fortis Okotoks | Structural Excavation/Backfill, Site Grading, Water, Sanitary & Storm Sewer Installation | Fortis |
Lethbridge Northern Headworks Diversion Weir | Temporary Division of Oldman River, Coffer Dam Installation, Dewatering, Fish Salvage, Expose Concrete Slab for Engineer Inspection & Site Restoration | Alberta Transportation |
Hays Farm Watermain Replacement | Watermain Replacement (Pipe Bursting) | Diversified Management |
2016 Projects
Project Location | Work Performed | Owner |
---|---|---|
Thomas Drive Bioswale, Strathmore | Excavation, Earthworks, Sub-drain & Culvert, Topsoil Restoration, Landscaping | Town of Strathmore |
Macleod Trail SW Dike Closure, High River | Excavation, Manhole/Catch Basin Installation, Slope Protection, Rip-Rap Haul & Place, Roadwork, Curb, Gutter & Sidewalk | Town of High River |
Notre Dame Collegiate Site Grading & Services, High River | Excavation, Site Servicing, Running Track & Football Field Development | Christ The Redeemer School Division |
AG Grounds Metering Vault Installation, Strathmore | Excavation, Metering Vault Installation, Watermain Tie-in, Site Restoration | Town of Strathmore |
Vulcan County Bridge Culverts, Milo, Lomond & Vulcan | Excavation, Bridge Demolition, Roadwork, CSP & SPCSP Install, Concrete End Treatments, Rip-Rap Supply & Place | Vulcan County |
Notre Dame Collegiate Portable Addition, High River | Excavation, Screw Piling | Carbon Constructors |
2015 Projects
Project Location | Work Performed | Owner |
---|---|---|
High River WTP Backwash Storage | Structure Excavation/Backfill, Screw Pile Shoring System, Water Lines & Concrete Vaults | Town of High River |
Town of Nanton Infrastructure Improvements | Excavation, Watermain & Hydrant Installation, Roadwork, Culverts, Retention Pond | Town of Nanton |
Bob Snodgrass Recreation Complex, High River | Excavation, Grading & Granular Sub-base Surfacing, Electrical & Light Standard Install, Post & Cable Fencing | Town of High River |
Janet Substation, Calgary | Excavation & Site Drainage Improvements, Rip-Rap, Roadwork, Concrete Culvert, Erosion Control | AltaLink c/o Morrison Hershfield |
Highway 40 over Lineham Creek, Kananaskis | Excavation, Bridgework, Rip-Rap, Erosion Control | Alberta Transportation |
Vulcan Solar Park, Vulcan | Screw Piling | Town of Vulcan |
2014 Projects
Project Location | Work Performed | Owner |
---|---|---|
Western Headworks Canal – Calgary to Chestermere | Silt Removal from Irrigation Canal | Alberta Transportation |
Flood Repairs throughout the MD of Foothills | Excavation Work/Sand Bagging & Cleanup | MD of Foothills |
Highwood River Channel Realignment | Excavation/Rip-Rap Slope Protection | Town of High River |
Wyndam Carseland Park, Bow River Slope Restoration | Excavation/Rip-Rap & Sierra Wall Slope Protection | Alberta Parks |
Wyndam Carseland Park, Day Use Area Restoration | Excavation/Grading/Gravel & Other Misc. Repairs | Alberta Parks |
Sunshine Lake Outfall & Bioswale Repairs | Excavation/Piping & Other Repairs required due to 2013 flooding | Town of High River |
2013 Projects
Project Location | Work Performed | Owner |
---|---|---|
Cowley/Lundbreck Water Treatment Plant, Southern Alberta | Site Work & Piping | MD of Pincher Creek |
Harvie Passage, Calgary, AB | Emergency Repairs | Alberta Transportation |
Little Bow River, Southern Alberta | Flood Clean-up | MD of Foothills |
2012 Projects
Project Location | Work Performed | Owner |
---|---|---|
Range Road #250, Irricana, AB | Roadway Widening | Rockyview County & CN Rail |
Western Headworks, Calgary, AB | Irrigation Canal Cleaning | Alberta Transportation |
Maple Reinders Office Site, Calgary, AB | Site Preparation, Detail Excavation & Deep Servicing | Maple Reinders |
Harmattan & Cynthia Oilfield, Central & Southern Alberta | Screw Piling | Exxon Mobil |
Traction Power Substation, Calgary, AB | Screw Piling | City of Calgary |
Sheppard Park, High River, AB | Bridge Construction | Town of High River |
2011 Projects
Project Location | Work Performed | Owner |
---|---|---|
Harmattan & Cynthia Oilfield, Central & Southern Alberta | Screw Piling | Exxon Mobil |
Gleichen Grain Terminal, Gleichen, AB | Intersection Improvements | PTC Construction |
Milo Elevator, Milo, AB | Drive Over Concrete Structure Improvements | Viterra |
Highway #804, Brant, AB | Roadway Reconstruction | Alberta Transportation |
2010 Projects
Project Location | Work performed | Owner |
---|---|---|
Hertz Rentals, Calgary, AB | Site Preparation & Detail Excavating | Hertz Rentals |
Ghost Lake Interchange, Ghost Lake, AB | Intersection Interchange Improvements | Standard General |
Milo Elevator, Milo, AB | Elevator Demolition | Viterra |
Chestermere, AB | Site Clean-Up | Mattamy Homes |
McDougald Reservoir, Maple Creek, SK | Reservoir Rehab | Agriculture & Agri-Food Canada |
Blackie Arena, Blackie, AB | Site Preparation & Detail Excavation | Blackie and District Agricultural Society |
East Lake Park, Airdrie, AB | Landscape Improvements & Screw Piling | City of Airdrie |
Cypress Motors, Swift Current, SK | Foundation Screw Piling | Cypress Motors |
Heritage Hills | Reservoir Retaining Wall Demolition & Screw Piling | Graham Infrastructure |
Picture Butte, AB | Solar Project Screw Piling | Goose Creek Renewable Energy |